The test plans on this page may be downloaded and used for internal purposes only. The test plans may not be commercialized in any way without express permission of the UNH-IOL.
The MIPI testing service currently offers the following test plans. These documents are constantly being updated to improve readability and to reflect the current specifications. Please contact us if you would like more information or have questions about the MIPI testing service.
When testing based on the following test plans is performed, all reports generated will be digitally signed using an Adobe digital certificate. Upon reception of the report, the recipient can verify its authenticity using our document validation instructions.
IOL
Conformance
- Status
- Fully Documented (Partially Implemented)
- Revision
- Testing Days Needed
- Last Modified
- 2019-01-31
- Status
- Fully Documented (Partially Implemented)
- Revision
- Testing Days Needed
- Last Modified
- 2019-01-31
- Status
- Fully Documented (Partially Implemented)
- Revision
- Testing Days Needed
- Last Modified
- 2019-01-31
- Status
- Fully Documented (Active)
- Revision
- 1.00
- Testing Days Needed
- 1 Week
- Last Modified
- 2013-06-28
- Abstract
- This Test Suite checks all physical layer requirements for D-PHY receivers.
- Status
- Fully Documented (Active)
- Revision
- 1.00
- Testing Days Needed
- 1 Week
- Last Modified
- 2010-08-31
- Abstract
- This test suite checks conformance to D-PHY Transmitter requirements as defined in the D-PHY Specification.
- Status
- Fully Documented (Active)
- Revision
- 1.00
- Testing Days Needed
- 1 Week
- Last Modified
- 2010-08-31
- Abstract
- This Test Suite checks all S-Parameter requirements for D-PHY products.
- Status
- Fully Documented (Active)
- Revision
- 1.00
- Testing Days Needed
- 1 week
- Last Modified
- 2010-09-01
- Abstract
- This Test Suite checks all S-Parameter requirements for D-PHY Transmitters.
Key